 |
UK Professional and graduate jobs service. Recruitment Agency specialising in Graduate Jobs, Sales Jobs, Recruitment Jobs, Engineering Jobs and Scientific Jobs.
|
|
|
|
|
 |
 |
Job Details for "Industrial/Process Engineer"
 |
|
 |
 |
|
| S81 |
| Engineering, Manufacturing |
| Negotiable |
Stafford
|
| 24/04/2008 12:30:00 |
|
 |
 |
 |
 |
 |
|
 |
 |
| Job Description |
Responsibilities: PMS – Product and Development
· Take concept and develop into process with specialists from Meru. · Take process and develop into Process Flow format. · Support equipment and tools definition with Development centre. · Develop PFMEA with UAP. · Attending non-injection tooling pre-studies, which are held in the Development centre. · Check equipment and tools specifications according to UK/European regulations and group standard. · Manage project documentation: e.g. project timing plans, budgets. · Tooling/machine trial checklists are completed, and follow up on any outstanding issues before tool launch to toolmakers. · Attend the pre-production tool trials at the suppliers to ensure Customer targets can be achieved. · Record problems identified at the trials at the suppliers on PDCA sheets, and ensure they are closed before the next trial. · Raise LUPAQ’s / PDCA, if a cross-functional team will be required to resolve the problems. PMS – Production set-up and pre-series
· Ensure that MPT trials are carried out on & off site and subsequently the results are recorded on the MPT trial sheets. · Develop MIFA. · Develop & implement plant layout. · Record any concerns on tooling and equipment which affect design / safety / Quality of the product. · Monitor equipment supplier progress. · Ensure that all documents are available prior to tool transfers. · Provide all relevant information to ensure tools and equipment transfer. · Ensure installation of equipment in plant. · Plan tools and equipment trials with UAP. · Plan contingency plan with UAP for series production. · Perform production trial run MPT with UAP and ensure results are recorded on MPT trial documents. · Ensure that shop floor documentation is completed to enable personnel to carry out their roles effectively (standard operations, setting sheets, start up doc.) · Support training of the relevant personnel on any new processes, which are being introduced to the plant. · Develop spare parts lists & TPM schedules. · Manage equipment documentation. · Ensure H&S approval with risk assessments completed. PMS – Production set-up and pre-series
· Optimise production process in order to achieve PV during ramp-up and peak volume. · Update standard operation / process document. · Sign off process into production.
|
|
 |
 |
 |
 |
If you are interested in this vacancy, please apply using the buttons below.
|
|
|
|
 |
|